Ørsted Finishes Drone Trial, Iberdrola Exits South Korea

Allen covers Ørsted’s Hornsea 2 drone trial, the DeepWind test site, Germany’s proposed land rent cap, and Iberdrola’s Korea exit.

The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s “Engineering with Rosie” Youtube channel. Have a question we can answer on the show? Email us!


Отзывы


Podcastly – the best platform for podcasters and podcast lovers. More than 10 millions of audio content that available on Android/iOS/Web/Desktop and Telegram.