Allen, Joel, Rosemary, and Yolanda discuss the ongoing federal halt on US offshore wind projects and mounting lawsuits from Equinor, Ørsted, and Dominion Energy. Plus Japan’s Goto floating wind farm begins commercial operation with eight Hitachi turbines on hybrid SPAR-type foundations, and Finnish investigators seize a vessel suspected of severing Baltic Sea cables.
Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us!
The Uptime Wind Energy Podcast brought to you by Strike Tape, protecting thousands of wind turbines from lightning damage worldwide. Visit striketape.com. And now your hosts, Allen Hall, Rosemary Barnes, Joel Saxum and Yolanda Padron. Welcome to the
Allen Hall: Uptime Wind Energy Podcast. I’m your host, Alan Hall. I’m here with Rosie Barnes, Joel Saxum, and Yolanda Padron.
Many things on the docket this week. The, the big one is the five US offshore wind projects that are facing cancellation after the federal halt. And on December 22nd, as we all know, the US Department of Interior ordered construction halted on every offshore wind project in American waters. Uh, the recent given and still given is national security.
Uh, developers see it way differently and they’ve been going to court to try to. Get this issue resolved. Ecuador, Ted and Dominion Energy have all filed lawsuits at this point. EOR says [00:01:00] a 90 day pause, which is what this is right now, will likely mean cancellation of their empire. Project Dominion is losing more than about $5 million a day, and everybody is watching to see what happens.
Orton’s also talking about taking some action here. Uh, there’s a, a lot of moving pieces. Essentially, as it stands right now, a lot of lawsuits, nothing happening in the water, and now talks mostly Ecuador of just completely canceling the project. That will have big implications to US. Electricity along the east coast,
Joel Saxum: right Joel?
Yeah. We need it. Right? So I, I hate to beat a dead horse here because we’ve been talking about this for so long. Um, but. We’ve got energy demand growth, right? We’re sitting at three to 5% year on year demand growth in the United States, uh, which is unprecedented. Since, since, and this is a crazy thing. Since air [00:02:00] conditioning was invented for residential homes, we have not had this much demand for electricity growth.
We’ve been pretty flat for the last 20 years. Uh, so we need it, right? We wanna be the AI data center superpower. We wanna do all this stuff. So we need electrons. Uh, these electrons are literally the quickest thing gonna be on the grid. Uh, up and down that whole eastern seaboard, which is a massive population center, a massive industrial and commercial center of the United States, and now we’re cutting the cord on ’em.
Uh, so it is going to drive prices up for all consumers. That is a reality, right? Um, so we, we hear campaign promises up and down the